• Ubermeisters@lemmy.zip
    link
    fedilink
    English
    arrow-up
    1
    ·
    edit-2
    1 year ago

    Is that the engineers fault? Or is that the people who are supposed to check for usability after the engineer is done designing the functional aspects? Because it’s not usually an engineer’s job to do this…

    Basic product testing is the foundation of manufacturing, an error like this doesn’t get all the way through production and it still be just the engineers fault.

    • Rivalarrival@lemmy.today
      link
      fedilink
      arrow-up
      0
      ·
      1 year ago

      They probably reused a PCB from another model that used a paperclip hole reset. They duplicated the design, sent it for testing, and came back with “everything is great, but make the reset a push button before you ship it.” Engineering probably said “ok. But it will need to go back for usability testing” and sales said “fuck that, send it”

      • criticon@lemmy.ca
        link
        fedilink
        arrow-up
        1
        ·
        1 year ago

        Or another possibility, after proto and lots of testing: “we need to move test button a couple of cm to the right, away from the corner. No further tests needed”