• moist_towelettes@lemm.ee
    link
    fedilink
    English
    arrow-up
    5
    ·
    edit-2
    1 year ago

    A level 0 master scheduled part is a form of blow-through part that forecasts at a high level among products of a similar design and can be disaggregated to level 1 and netted against actual demands to yield supply proposals within the planning time fence.